91ÁÔÆæ

Facilities Services

Facilities services maintains Reed’s 100-acre campus in a responsive and environmentally conscious manner.

Encompassing building maintanance, grounds, and environmental health and safety, facilities services is involved in the planning, design, construction, operation, and maintenance of all college facilities and grounds.

For routine repairs and key requests, please use the online maintenance and key request forms. Be sure to consult the prior to taking ownership of your keys. For additional assistance, please call 503-777-7283 or send us an email

Fiscal Year '27 Capital Projects*

*Small projects or those fulfilled outside of the Capital Project process may not be listed below.

Academic Spaces

Biology

  • Throughout - Replace hot water pumps
  • Throughout - Reinstall damaged signs 
  • B5/B7 - Add deionized water taps 
  • B11A - Add hallway outlet
  • B8 - Add card swipe access
  • B19 - Audio-Visual updates

Chemistry

  • C414 - Carpet replacement and office update (partly startup project)
  • C203 - Audio-Visual updates
  • C315 - Faculty laboratory renovation (new faculty startup project)

Performing Arts Building

  • Lounge - Furniture replacement
  • PARC - Chair replacement
  • PAB 320 - Audio-Visual updates
  • PAB 130 - Audio-Visual updates

Psychology

  • Psych 108/110 - Combine and renovate classroom
  • Psych 108/110 - Audio-Visual updates
  • Psych 105 - Audio-Visual updates

Studio Arts

  • Student studio spaces - Renovations
  • Art 205 - Install sink
  • Faculty office - Renovations (startup project)

Vollum 

  • Lecture Hall - ADA seating/study
  • Replace hallway furniture

Administrative Spaces

Dorothy Johansen House

  • DOJO 104 - update

Eliot Hall

  • Outdoor - West level one entry dry well repair
  • Outdoor - Northside downspout underground pipe replacement
  • Outdoor - Paint exterior window frames
  • E128 - Renovate for office space
  • Chapel - Audio-Visual updates
  • Eliot 314 - Audio-Visual updates
  • Eliot 419 - Audio-Visual updates

Educational Technology Center

  • Basement - Replace Liebert Server Units

Kaul Auditorium

  • Backstage - Replace flooring

Parker House

  • Roof replacement
  • Interior painting

Physical Plant

  • Install trench drain in tunne

Sports Center

  • Repaint squash court walls

Steele Street Annex

  • Middle unit - Paint back room
  • Middle unit - Paint and repair former reception area
  • Middle unit - New rooftop HVAC unit installation

Campus Exterior Spaces

  • Eliot Circle - Concrete roadway replacement (ADA project)
  • Eliot Circle - Infill mature cherry trees with new stock
  • Botsford Drive - Sidewalk and apron crossing (ADA project)
  • Greywood - Replace blacktop with a concrete walkway (safe pathways)

Residential Spaces

Birchwoods (Multi-year project)

  • Electrical Service upgrades
  • Siding & Window replacement
  • Metal stairway repair

Bragdon

  • Replace kitchen countertops
  • Replace dorm room furniture

Foster/Scholz

  • Replace fire alarm system
  • Replace dorm room furniture

MacNaughton

  • Replace fire alarm system
  • Replace dorm room furniture

Old Dorm Block

  • Repair/replace dorm room electrical

Trillium

  • Window repairs